All operations related to the decommissioning of Site-96 have been concluded. The subsequent report outlines the findings of the operation. Staff were extracted from the site prior to the triggering of the shutdown sequence. A thorough survey of the site revealed undetectable collateral impact. Further investigation is warranted to determine the